Track Train back

Track Train Live Status


Running Status

Overview of 12533 Pushpak Express

Looking online to get an insight of the train Pushpak express running with train number 12533? If yes, do read on the following and you will get to know of the same here. Being a superfast train, Pushpak express runs on daily basis in between Lucknow and Mumbai in India. Train 12533 runs from Lucknow junction to Mumbai CSM junction across the country. Belonging to North Eastern Railways, the distance covered by the train in total is 1426 km. The average operating speed of the train is 58 km/hour and the travel time is of around 24 hours and 30 minutes.

Do you need to know the timing of train 12533 as well at which it leaves and reaches the desired junction? In accord to the same, train 12533 leaves from Lucknow junction at 19:45 hours and reaches Mumbai CSM at 20:15 hours. It stops by at 14 halts in between the journey and few of them are at Unnao, Kanpur Central, Orai, Jhansi, Lalitpur, Bhopal, Itarsi, Khandwa, Bhusaval, Nasik Road, Kalyan and Dadar Central. The train has 24 coaches available in total including first class AC, AC 2 tier, AC 3 tier, sleeper and general unreserved class of coaches. There is a pantry car attached within and if desired, do feel free to try out e-catering food meal services from Travel Khana. Also, with the help of Spot your train utility, do know about the train’s actual location and position within seconds. Have a safe travel!

Spot your running train status 12533/PUSHPAK Exp

Check the current running status of 12533/PUSHPAK Exp which runs between GOMTI NAGAR to C SHIVAJI MAH T Mentioned below are the details of your running train which includes arrival and departure timings, present station of the train, train delay and arrival timings.

12533 / PUSHPAK Exp(GOMTI NAGAR - C SHIVAJI MAH T) Running Train Status

    RunsOn-
  • Sun
  • Mon
  • Tue
  • Wed
  • Thu
  • Fri
  • Sat
  • Current Station AIT
  • Start Date 21 Oct 2026
  • Last Updated 01:03 22-Oct-2026
  • Status Train Started
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

GOMTI NAGAR (GTNR)

Origin/Origin

20:45/20:45

0 min

Departed / On Time

1

Platform 6

BADSHAHNAGAR (BNZ)

20:57/20:55

21:00/21:00

3 min

Departed / Late by 2 min

1

Platform 2

AISHBAGH (ASH)

21:17/21:23

21:26/21:25

9 min

Departed / Late by 1 min

1

Platform 3

UNNAO JN (ON)

22:23/22:20

22:25/22:22

2 min

Departed / Late by 3 min

1

Platform 2

KANPUR CENTRAL (CNB)

22:51/23:05

23:16/23:10

25 min

Departed / Late by 6 min

1

Platform 5

ORAI (ORAI)

00:36/00:37

00:40/00:39

4 min

Departed / Late by 1 min

2

Platform 3

VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ)

02:40/02:40

02:48/02:48

8 min

On Time

2

Platform 1

LALITPUR (LAR)

04:00/04:00

04:02/04:02

2 min

On Time

2

Platform 2

BHOPAL JN (BPL)

07:00/07:00

07:10/07:10

10 min

On Time

2

Platform 1

RANI KAMALAPATI (RKMP)

07:22/07:22

07:24/07:24

2 min

On Time

2

Platform 4

ITARSI JN (ET)

08:55/08:55

09:00/09:00

5 min

On Time

2

Platform 2

KHANDWA JN (KNW)

11:53/11:53

11:55/11:55

2 min

On Time

2

Platform 720

BHUSAVAL JN (BSL)

13:45/13:45

13:50/13:50

5 min

On Time

2

Platform 2

MANMAD JN (MMR)

16:13/16:13

16:15/16:15

2 min

On Time

2

Platform 3

NASIK ROAD (NK)

17:18/17:18

17:23/17:23

5 min

On Time

2

Platform 3

IGATPURI (IGP)

18:22/18:22

18:27/18:27

5 min

On Time

2

Platform 4

KALYAN JN (KYN)

20:07/20:07

20:10/20:10

3 min

On Time

2

Platform 5

DADAR (DR)

20:57/20:57

21:00/21:00

3 min

On Time

2

Platform 12

C SHIVAJI MAH T (CSMT)

21:20/21:20

Destination/Destination

--

On Time

2

Platform 11

  • Current Station C SHIVAJI MAH T
  • Start Date 20 Oct 2026
  • Last Updated 01:03 22-Oct-2026
  • Status Train Reached
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

GOMTI NAGAR (GTNR)

Origin/Origin

23:30/20:45

0 min

Departed / Late by 2hr 45min

1

Platform 6

BADSHAHNAGAR (BNZ)

23:43/20:55

23:45/21:00

2 min

Departed / Late by 2hr 48min

1

Platform 2

AISHBAGH (ASH)

00:03/21:23

00:06/21:25

3 min

Departed / On Time

2

Platform 3

UNNAO JN (ON)

01:32/22:20

01:36/22:22

4 min

Departed / On Time

2

Platform 2

KANPUR CENTRAL (CNB)

02:22/23:05

02:27/23:10

5 min

Departed / On Time

2

Platform 5

ORAI (ORAI)

03:48/00:37

03:50/00:39

2 min

Departed / Late by 3hr 11min

2

Platform 3

VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ)

05:55/02:40

06:04/02:48

9 min

Departed / Late by 3hr 16min

2

Platform 1

LALITPUR (LAR)

07:15/04:00

07:22/04:02

7 min

Departed / Late by 3hr 20min

2

Platform 2

BHOPAL JN (BPL)

10:13/07:00

10:24/07:10

11 min

Departed / Late by 3hr 14min

2

Platform 1

RANI KAMALAPATI (RKMP)

10:36/07:22

10:39/07:24

3 min

Departed / Late by 3hr 15min

2

Platform 4

ITARSI JN (ET)

12:03/08:55

12:12/09:00

9 min

Departed / Late by 3hr 12min

2

Platform 3

KHANDWA JN (KNW)

14:22/11:53

14:25/11:55

3 min

Departed / Late by 2hr 30min

2

Platform 720

BHUSAVAL JN (BSL)

16:01/13:45

16:16/13:50

15 min

Departed / Late by 2hr 26min

2

Platform 2

MANMAD JN (MMR)

18:22/16:13

18:26/16:15

4 min

Departed / Late by 2hr 11min

2

Platform 3

NASIK ROAD (NK)

19:28/17:18

19:33/17:23

5 min

Departed / Late by 2hr 10min

2

Platform 3

IGATPURI (IGP)

20:26/18:22

20:33/18:27

7 min

Departed / Late by 2hr 6min

2

Platform 4

KALYAN JN (KYN)

22:38/20:07

22:41/20:10

3 min

Departed / Late by 2hr 31min

2

Platform 5

DADAR (DR)

21:00/20:57

--/--

--

Arrived / Late by 3 min

2

Platform 12

C SHIVAJI MAH T (CSMT)

23:48/21:20

Destination/Destination

--

Arrived / Late by 2hr 28min

2

Platform 11

  • Current Station C SHIVAJI MAH T
  • Start Date 19 Oct 2026
  • Last Updated 01:03 22-Oct-2026
  • Status Train Reached
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

GOMTI NAGAR (GTNR)

Origin/Origin

22:21/20:45

0 min

Departed / Late by 1hr 36min

1

Platform 6

BADSHAHNAGAR (BNZ)

22:33/20:55

22:36/21:00

3 min

Departed / Late by 1hr 38min

1

Platform 2

AISHBAGH (ASH)

23:06/21:23

23:16/21:25

10 min

Departed / Late by 1hr 51min

1

Platform 2

UNNAO JN (ON)

00:44/22:20

00:48/22:22

4 min

Departed / On Time

2

Platform 2

KANPUR CENTRAL (CNB)

01:16/23:05

01:34/23:10

18 min

Departed / On Time

2

Platform 5

ORAI (ORAI)

02:58/00:37

03:01/00:39

3 min

Departed / Late by 2hr 22min

2

Platform 3

VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ)

04:36/02:40

04:48/02:48

12 min

Departed / Late by 2hr

2

Platform 1

LALITPUR (LAR)

06:07/04:00

06:09/04:02

2 min

Departed / Late by 2hr 7min

2

Platform 2

BHOPAL JN (BPL)

08:48/07:00

08:59/07:10

11 min

Departed / Late by 1hr 49min

2

Platform 1

RANI KAMALAPATI (RKMP)

09:13/07:22

09:16/07:24

3 min

Departed / Late by 1hr 52min

2

Platform 4

ITARSI JN (ET)

10:59/08:55

11:03/09:00

4 min

Departed / Late by 2hr 4min

2

Platform 3

KHANDWA JN (KNW)

13:31/11:53

13:35/11:55

4 min

Departed / Late by 1hr 40min

2

Platform 720

BHUSAVAL JN (BSL)

15:37/13:45

15:48/13:50

11 min

Departed / Late by 1hr 58min

2

Platform 2

MANMAD JN (MMR)

18:37/16:13

18:43/16:15

6 min

Departed / Late by 2hr 28min

2

Platform 3

NASIK ROAD (NK)

19:44/17:18

19:49/17:23

5 min

Departed / Late by 2hr 26min

2

Platform 3

IGATPURI (IGP)

20:38/18:22

20:44/18:27

6 min

Departed / Late by 2hr 17min

2

Platform 4

KALYAN JN (KYN)

22:45/20:07

22:48/20:10

3 min

Departed / Late by 2hr 38min

2

Platform 5

DADAR (DR)

23:27/20:57

23:29/21:00

2 min

Departed / Late by 2hr 30min

2

Platform 12

C SHIVAJI MAH T (CSMT)

23:44/21:20

Destination/Destination

--

Arrived / Late by 2hr 24min

2

Platform 11

  • Current Station C SHIVAJI MAH T
  • Start Date 18 Oct 2026
  • Last Updated 05:22 21-Oct-2026
  • Status Train Reached
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

GOMTI NAGAR (GTNR)

Origin/Origin

20:46/20:45

0 min

Departed / Late by 1 min

1

Platform 6

BADSHAHNAGAR (BNZ)

20:57/20:55

21:01/21:00

4 min

Departed / Late by 2 min

1

Platform 2

AISHBAGH (ASH)

21:19/21:23

21:25/21:25

6 min

Departed / On Time

1

Platform 3

UNNAO JN (ON)

22:30/22:20

22:32/22:22

2 min

Departed / Late by 10 min

1

Platform 2

KANPUR CENTRAL (CNB)

23:02/23:05

23:13/23:10

11 min

Departed / Late by 3 min

1

Platform 5

ORAI (ORAI)

00:39/00:37

00:43/00:39

4 min

Departed / Late by 4 min

2

Platform 3

VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ)

02:41/02:40

02:50/02:48

9 min

Departed / Late by 2 min

2

Platform 1

LALITPUR (LAR)

04:17/04:00

04:19/04:02

2 min

Departed / Late by 17 min

2

Platform 2

BHOPAL JN (BPL)

07:12/07:00

07:22/07:10

10 min

Departed / Late by 12 min

2

Platform 1

RANI KAMALAPATI (RKMP)

07:36/07:22

07:38/07:24

2 min

Departed / Late by 14 min

2

Platform 4

ITARSI JN (ET)

09:08/08:55

09:13/09:00

5 min

Departed / Late by 13 min

2

Platform 3

KHANDWA JN (KNW)

11:47/11:53

11:56/11:55

9 min

Departed / Late by 1 min

2

Platform 720

BHUSAVAL JN (BSL)

13:43/13:45

13:51/13:50

8 min

Departed / Late by 1 min

2

Platform 2

MANMAD JN (MMR)

16:21/16:13

16:24/16:15

3 min

Departed / Late by 9 min

2

Platform 3

NASIK ROAD (NK)

17:28/17:18

17:35/17:23

7 min

Departed / Late by 12 min

2

Platform 3

IGATPURI (IGP)

18:33/18:22

18:40/18:27

7 min

Departed / Late by 13 min

2

Platform 4

KALYAN JN (KYN)

21:13/20:07

21:15/20:10

2 min

Departed / Late by 1hr 6min

2

Platform 5

DADAR (DR)

22:06/20:57

22:08/21:00

2 min

Departed / Late by 1hr 9min

2

Platform 12

C SHIVAJI MAH T (CSMT)

22:30/21:20

Destination/Destination

--

Arrived / Late by 1hr 10min

2

Platform 13

  • Current Station C SHIVAJI MAH T
  • Start Date 17 Oct 2026
  • Last Updated 05:21 20-Oct-2026
  • Status Train Reached
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

GOMTI NAGAR (GTNR)

Origin/Origin

20:45/20:45

0 min

Departed / On Time

1

Platform 6

BADSHAHNAGAR (BNZ)

20:56/20:55

21:00/21:00

4 min

Departed / Late by 1 min

1

Platform 2

AISHBAGH (ASH)

21:23/21:23

21:27/21:25

4 min

Departed / Late by 2 min

1

Platform 2

UNNAO JN (ON)

22:37/22:20

22:40/22:22

3 min

Departed / Late by 18 min

1

Platform 2

KANPUR CENTRAL (CNB)

23:05/23:05

23:24/23:10

19 min

Departed / Late by 14 min

1

Platform 5

ORAI (ORAI)

01:01/00:37

01:05/00:39

4 min

Departed / Late by 26 min

2

Platform 3

VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ)

03:09/02:40

03:17/02:48

8 min

Departed / Late by 29 min

2

Platform 1

LALITPUR (LAR)

04:24/04:00

04:27/04:02

3 min

Departed / Late by 25 min

2

Platform 2

BHOPAL JN (BPL)

07:26/07:00

07:37/07:10

11 min

Departed / Late by 27 min

2

Platform 1

RANI KAMALAPATI (RKMP)

07:51/07:22

07:54/07:24

3 min

Departed / Late by 30 min

2

Platform 4

ITARSI JN (ET)

09:18/08:55

09:22/09:00

4 min

Departed / Late by 23 min

2

Platform 2

KHANDWA JN (KNW)

11:49/11:53

11:55/11:55

6 min

Departed / On Time

2

Platform 720

BHUSAVAL JN (BSL)

14:28/13:45

14:38/13:50

10 min

Departed / Late by 48 min

2

Platform 2

MANMAD JN (MMR)

17:09/16:13

17:14/16:15

5 min

Departed / Late by 59 min

2

Platform 3

NASIK ROAD (NK)

18:12/17:18

18:16/17:23

4 min

Departed / Late by 54 min

2

Platform 3

IGATPURI (IGP)

19:03/18:22

19:09/18:27

6 min

Departed / Late by 42 min

2

Platform 4

KALYAN JN (KYN)

21:10/20:07

21:13/20:10

3 min

Departed / Late by 1hr 3min

2

Platform 5

DADAR (DR)

21:56/20:57

22:01/21:00

5 min

Departed / Late by 1hr 1min

2

Platform 12

C SHIVAJI MAH T (CSMT)

22:18/21:20

Destination/Destination

--

Arrived / Late by 58 min

2

Platform 11

  • Current Station PALDHI
  • Start Date 16 Oct 2026
  • Last Updated 05:26 19-Oct-2026
  • Status Train Diverted
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

GOMTI NAGAR (GTNR)

Origin/Origin

20:45/20:45

0 min

Departed / On Time

1

Platform 6

BADSHAHNAGAR (BNZ)

20:58/20:55

21:01/21:00

3 min

Departed / Late by 3 min

1

Platform 2

AISHBAGH (ASH)

21:20/21:23

21:25/21:25

5 min

Departed / On Time

1

Platform 3

UNNAO JN (ON)

22:19/22:20

22:22/22:22

3 min

Departed / On Time

1

Platform 2

KANPUR CENTRAL (CNB)

22:53/23:05

23:14/23:10

21 min

Departed / Late by 4 min

1

Platform 5

ORAI (ORAI)

00:46/00:37

00:50/00:39

4 min

Departed / Late by 11 min

2

Platform 3

VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ)

02:59/02:40

03:10/02:48

11 min

Departed / Late by 22 min

2

Platform 1

LALITPUR (LAR)

04:16/04:00

04:18/04:02

2 min

Departed / Late by 16 min

2

Platform 2

BHOPAL JN (BPL)

07:21/07:00

07:31/07:10

10 min

Departed / Late by 21 min

2

Platform 1

RANI KAMALAPATI (RKMP)

07:44/07:22

07:47/07:24

3 min

Departed / Late by 23 min

2

Platform 4

ITARSI JN (ET)

09:20/08:55

09:24/09:00

4 min

Departed / Late by 25 min

2

Platform 3

KHANDWA JN (KNW)

12:00/11:53

12:04/11:55

4 min

Departed / Late by 9 min

2

Platform 720

BHUSAVAL JN (BSL)

13:53/13:45

14:03/13:50

10 min

Departed / Late by 13 min

2

Platform 2

MANMAD JN (MMR)

16:13/06:46

--/16:15

--

Arrived / Late by 9hr 27min

2

Platform 3

NASIK ROAD (NK)

17:23/17:18

--/--

--

Arrived / Late by 5 min

2

Platform 3

IGATPURI (IGP)

18:27/18:22

--/--

--

Arrived / Late by 5 min

2

Platform 4

KALYAN JN (KYN)

20:10/20:07

--/--

--

Arrived / Late by 3 min

2

Platform 5

DADAR (DR)

20:57/06:46

21:00/01:52

3 min

Departed / Late by 19hr 8min

2

Platform 12

C SHIVAJI MAH T (CSMT)

02:09/21:20

Destination/Destination

--

Arrived / On Time

3

Platform 13

  • Current Station C SHIVAJI MAH T
  • Start Date 15 Oct 2026
  • Last Updated 05:28 18-Oct-2026
  • Status Train Reached
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

GOMTI NAGAR (GTNR)

Origin/Origin

20:45/20:45

0 min

Departed / On Time

1

Platform 6

BADSHAHNAGAR (BNZ)

20:57/20:55

21:00/21:00

3 min

Departed / Late by 2 min

1

Platform 2

AISHBAGH (ASH)

21:20/21:23

21:29/21:25

9 min

Departed / Late by 4 min

1

Platform 2

UNNAO JN (ON)

22:22/22:20

22:24/22:22

2 min

Departed / Late by 2 min

1

Platform 2

KANPUR CENTRAL (CNB)

23:05/23:05

23:20/23:10

15 min

Departed / Late by 10 min

1

Platform 5

ORAI (ORAI)

00:57/00:37

01:01/00:39

4 min

Departed / Late by 22 min

2

Platform 3

VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ)

02:34/02:40

02:48/02:48

14 min

Departed / On Time

2

Platform 1

LALITPUR (LAR)

04:02/04:00

04:05/04:02

3 min

Departed / Late by 3 min

2

Platform 2

BHOPAL JN (BPL)

07:06/07:00

07:26/07:10

20 min

Departed / Late by 16 min

2

Platform 1

RANI KAMALAPATI (RKMP)

07:44/07:22

07:46/07:24

2 min

Departed / Late by 22 min

2

Platform 4

ITARSI JN (ET)

09:26/08:55

09:34/09:00

8 min

Departed / Late by 34 min

2

Platform 2

KHANDWA JN (KNW)

11:53/11:53

11:59/11:55

6 min

Departed / Late by 4 min

2

Platform 720

BHUSAVAL JN (BSL)

13:41/13:45

13:52/13:50

11 min

Departed / Late by 2 min

2

Platform 2

MANMAD JN (MMR)

16:27/16:13

16:31/16:15

4 min

Departed / Late by 16 min

2

Platform 3

NASIK ROAD (NK)

17:36/17:18

17:43/17:23

7 min

Departed / Late by 20 min

2

Platform 3

IGATPURI (IGP)

20:15/18:22

20:21/18:27

6 min

Departed / Late by 1hr 54min

2

Platform 4

KALYAN JN (KYN)

22:18/20:07

22:21/20:10

3 min

Departed / Late by 2hr 11min

2

Platform 5

DADAR (DR)

23:01/20:57

23:05/21:00

4 min

Departed / Late by 2hr 5min

2

Platform 12

C SHIVAJI MAH T (CSMT)

23:30/21:20

Destination/Destination

--

Arrived / Late by 2hr 10min

2

Platform 11

Train Delay Pattern of 12533 / PUSHPAK EXPRESS

Station Arrival 2026-10-20 2026-10-19 2026-10-18 2026-10-17 2026-10-16 2026-10-15 2026-10-14
GOMTI NAGAR (GTNR) Origin 0 min 0 min 0 min 0 min 0 min 0 min 0 min
BADSHAHNAGAR (BNZ) 20:55 168 min 98 min 2 min 1 min 3 min 2 min 3 min
AISHBAGH (ASH) 21:23 0 min 103 min 0 min 0 min 0 min 0 min 0 min
UNNAO JN (ON) 22:20 0 min 0 min 10 min 17 min 0 min 2 min 12 min
KANPUR CENTRAL (CNB) 23:05 0 min 0 min 0 min 0 min 0 min 0 min 12 min
ORAI (ORAI) 00:37 191 min 141 min 2 min 24 min 9 min 20 min 30 min
VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ) 02:40 195 min 116 min 1 min 29 min 19 min 0 min 0 min
LALITPUR (LAR) 04:00 195 min 127 min 17 min 24 min 16 min 2 min 12 min
BHOPAL JN (BPL) 07:00 193 min 108 min 12 min 26 min 21 min 6 min 25 min
RANI KAMALAPATI (RKMP) 07:22 194 min 111 min 14 min 29 min 22 min 22 min 32 min
ITARSI JN (ET) 08:55 188 min 124 min 13 min 23 min 25 min 31 min 38 min
KHANDWA JN (KNW) 11:53 149 min 98 min 0 min 0 min 7 min 0 min 22 min
BHUSAVAL JN (BSL) 13:45 136 min 112 min 0 min 43 min 8 min 0 min 20 min
MANMAD JN (MMR) 16:13 129 min 144 min 8 min 56 min 567 min 14 min 24 min
NASIK ROAD (NK) 17:18 130 min 146 min 10 min 54 min 5 min 18 min 57 min
IGATPURI (IGP) 18:22 124 min 136 min 11 min 41 min 5 min 113 min 72 min
KALYAN JN (KYN) 20:07 151 min 158 min 66 min 63 min 3 min 131 min 167 min
DADAR (DR) 20:57 3 min 150 min 69 min 59 min 851 min 124 min 3 min
C SHIVAJI MAH T (CSMT) 21:20 148 min 144 min 70 min 58 min 0 min 130 min 0 min

Frequently Ask Question about Train

Train Running Status Live Updates

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived