Track Train Live Status Back to track train search

Track Train Live Status


Running Status

Overview of 12533 Pushpak Express

Looking online to get an insight of the train Pushpak express running with train number 12533? If yes, do read on the following and you will get to know of the same here. Being a superfast train, Pushpak express runs on daily basis in between Lucknow and Mumbai in India. Train 12533 runs from Lucknow junction to Mumbai CSM junction across the country. Belonging to North Eastern Railways, the distance covered by the train in total is 1426 km. The average operating speed of the train is 58 km/hour and the travel time is of around 24 hours and 30 minutes.

Do you need to know the timing of train 12533 as well at which it leaves and reaches the desired junction? In accord to the same, train 12533 leaves from Lucknow junction at 19:45 hours and reaches Mumbai CSM at 20:15 hours. It stops by at 14 halts in between the journey and few of them are at Unnao, Kanpur Central, Orai, Jhansi, Lalitpur, Bhopal, Itarsi, Khandwa, Bhusaval, Nasik Road, Kalyan and Dadar Central. The train has 24 coaches available in total including first class AC, AC 2 tier, AC 3 tier, sleeper and general unreserved class of coaches. There is a pantry car attached within and if desired, do feel free to try out e-catering food meal services from Travel Khana. Also, with the help of Spot your train utility, do know about the train’s actual location and position within seconds. Have a safe travel!

Spot your running train status 12533/PUSHPAK Exp

Check the current running status of 12533/PUSHPAK Exp which runs between GOMTI NAGAR to C SHIVAJI MAH T Mentioned below are the details of your running train which includes arrival and departure timings, present station of the train, train delay and arrival timings.

12533 / PUSHPAK Exp Running Train Status

    RunsOn-
  • Sun
  • Mon
  • Tue
  • Wed
  • Thu
  • Fri
  • Sat
  • Current Station BASAI
  • Start Date 18 Nov 2026
  • Last Updated 03:40 19-Nov-2026
  • Status Train Started
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform
GOMTI NAGAR (GTNR) Origin/Origin 20:45/20:45 0 minDeparted / On Time 1 Platform 6
BADSHAHNAGAR (BNZ) 20:58/20:55 21:00/21:00 2 minDeparted / Late by 3 min 1 Platform 2
AISHBAGH (ASH) 21:19/21:23 21:25/21:25 6 minDeparted / On Time 1 Platform 3
UNNAO JN (ON) 22:33/22:20 22:36/22:22 3 minDeparted / Late by 14 min 1 Platform 2
KANPUR CENTRAL (CNB) 23:14/23:05 23:30/23:10 16 minDeparted / Late by 20 min 1 Platform 5
ORAI (ORAI) 00:56/00:37 01:00/00:39 4 minDeparted / Late by 21 min 2 Platform 3
VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ) 02:53/02:40 03:08/02:48 15 minDeparted / Late by 20 min 2 Platform 1
LALITPUR JN (LAR) 04:00/04:00 04:02/04:02 2 minOn Time 2 Platform 2
BHOPAL JN (BPL) 07:00/07:00 07:10/07:10 10 minOn Time 2 Platform 1
RANI KAMALAPATI (RKMP) 07:22/07:22 07:24/07:24 2 minOn Time 2 Platform 4
ITARSI JN (ET) 08:55/08:55 09:00/09:00 5 minOn Time 2 Platform 2
KHANDWA JN (KNW) 11:53/11:53 11:55/11:55 2 minOn Time 2 Platform 720
BHUSAVAL JN (BSL) 13:45/13:45 13:50/13:50 5 minOn Time 2 Platform 2
MANMAD JN (MMR) 16:13/16:13 16:15/16:15 2 minOn Time 2 Platform 3
NASIK ROAD (NK) 17:18/17:18 17:23/17:23 5 minOn Time 2 Platform 3
IGATPURI (IGP) 18:22/18:22 18:27/18:27 5 minOn Time 2 Platform 4
KALYAN JN (KYN) 20:07/20:07 20:10/20:10 3 minOn Time 2 Platform 5
DADAR (DR) 20:57/20:57 21:00/21:00 3 minOn Time 2 Platform 12
C SHIVAJI MAH T (CSMT) 21:20/21:20 Destination/Destination --On Time 2 Platform 11

Train Delay Pattern of 12533 / PUSHPAK EXPRESS

Station Arrival 2026-11-17 2026-11-16 2026-11-15 2026-11-14 2026-11-13 2026-11-12 2026-11-11
GOMTI NAGAR (GTNR) Origin 0 min 0 min 0 min 0 min 0 min 0 min 0 min
BADSHAHNAGAR (BNZ) 20:55 0 min 0 min 1 min 0 min 0 min 5 min 3 min
AISHBAGH (ASH) 21:23 0 min 0 min 0 min 0 min 0 min 0 min 0 min
UNNAO JN (ON) 22:20 17 min 0 min 0 min 0 min 6 min 9 min 0 min
KANPUR CENTRAL (CNB) 23:05 1 min 0 min 0 min 0 min 12 min 17 min 14 min
ORAI (ORAI) 00:37 13 min 20 min 2 min 0 min 9 min 20 min 26 min
VIRANGANA LAKSHMIBAI JHANSI JN (VGLJ) 02:40 0 min 0 min 0 min 0 min 15 min 5 min 2 min
LALITPUR JN (LAR) 04:00 12 min 8 min 2 min 18 min 30 min 10 min 8 min
BHOPAL JN (BPL) 07:00 14 min 22 min 0 min 7 min 10 min 0 min 0 min
RANI KAMALAPATI (RKMP) 07:22 3 min 24 min 1 min 9 min 22 min 11 min 7 min
ITARSI JN (ET) 08:55 29 min 16 min 8 min 14 min 15 min 5 min 6 min
KHANDWA JN (KNW) 11:53 44 min 1 min 6 min 0 min 4 min 0 min 0 min
BHUSAVAL JN (BSL) 13:45 56 min 0 min 7 min 3 min 0 min 0 min 5 min
MANMAD JN (MMR) 16:13 44 min 22 min 41 min 20 min 16 min 2 min 22 min
NASIK ROAD (NK) 17:18 65 min 19 min 39 min 13 min 15 min 15 min 21 min
IGATPURI (IGP) 18:22 46 min 3 min 23 min 0 min 4 min 19 min 5 min
KALYAN JN (KYN) 20:07 42 min 18 min 21 min 20 min 8 min 19 min 16 min
DADAR (DR) 20:57 3 min 3 min 3 min 3 min 3 min 3 min 3 min
C SHIVAJI MAH T (CSMT) 21:20 33 min 10 min 15 min 12 min 0 min 14 min 11 min

Frequently Ask Question about Train

Train Running Status Live Updates

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • PUSHPAK EXPRESS(12533) Departed from () at on Reached its Destination () at on Status: On Time Arrived